Date: 12/31/1969 Views: 5103
Date: 09/08/2009 Views: 4608
Date: 10/23/2003 Views: 6348
Date: 08/23/2023 Views: 693377
While clamped, three holes were drilled for retainer hardware. One hole in the landing gear handle recess and two holes in the panel lower flange on the starboard side. The upper flange was marked for trim while the panel was clamped.