Date: 06/07/2009 Views: 5335
Date: 07/19/2007 Views: 5430
Date: 05/18/2012 Views: 6161
Date: 08/23/2023 Views: 754527
While clamped, three holes were drilled for retainer hardware. One hole in the landing gear handle recess and two holes in the panel lower flange on the starboard side. The upper flange was marked for trim while the panel was clamped.