Starboard flange will be reduced to prevent so much seal bulging out. Y9-11-27
Date: 11/18/2009
Views: 2569
Newest Image
EAA SITE
Date: 08/23/2023
Views: 82352
Wing 6.
Port wing is flipped over so 3 BID layup doesn't have to fight that gravity.
Wingtip is wet out and floxed with Aeropoxy/60 minute hardener and here using a 1" chip brush with most of handle cut off laying down 3 BID.
Y9-09-12