Date: 12/31/1969 Views: 6902
Date: 01/01/2009 Views: 14345
Date: 07/09/2006 Views: 4316
Date: 08/23/2023 Views: 811432
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.