Date: 10/11/2009 Views: 5498
Date: 01/11/2010 Views: 7841
Date: 03/12/2006 Views: 4092
Date: 08/23/2023 Views: 808050
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09