Date: 12/31/1969 Views: 2835
Date: 07/29/2007 Views: 2128
Date: 04/16/2008 Views: 4066
Date: 08/23/2023 Views: 82138
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.