Date: 07/13/2010 Views: 6740
Date: 06/12/2006 Views: 7976
Date: 08/27/2006 Views: 5395
Date: 08/23/2023 Views: 783997
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.