Date: 08/15/2004 Views: 3312
Date: 06/10/2010 Views: 6332
Date: 07/12/2009 Views: 12493
Date: 08/23/2023 Views: 695089
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09