Date: 06/03/2007 Views: 3985
Date: 02/21/2011 Views: 3073
Date: 12/31/1969 Views: 6524
Date: 08/23/2023 Views: 702513
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.