Date: 10/11/2009 Views: 5162
Date: 05/22/2008 Views: 4219
Date: 09/11/2006 Views: 5113
Date: 08/23/2023 Views: 850011
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09