Rough River 2010 notes on long wing spar strengthening.
Date: 09/21/2010
Views: 3981
Newest Image
EAA SITE
Date: 08/23/2023
Views: 827078
Tie-bar 46.
Shot of fixture and plate in position.
The tie-bar is slightly rotated here in relation to the socket.
The top of the aluminium fixture is drilled for the final 3 holes that go through the wood.
Y10-11-20