Took a little less than 2 hours to fit bottom of starboard door including cleaning up sanding dust.
Date: 10/20/2009
Views: 5512
Door hinge rebates 39.
Date: 11/06/2009
Views: 5361
05072003202304_G
Date: 12/31/1969
Views: 4275
Newest Image
EAA SITE
Date: 08/23/2023
Views: 754595
Rebricking.
Port wing top skin bond on is complete.
During final pass bond on we had our air conditioner on along with one 1500 watt electric heater on high and another 1500 watt electric heater on low. temperature was 72F with 38% humidity.
I will turn off lights and air conditioner and leave both heaters on high over night.
The tape on wing is showing where ribs are.
In prior pics where you saw a number of smaller pieces of tape, it was indicating where there was an area that needed the richer Flox Redux mixture.
Y10-09-13