Date: 12/31/1969 Views: 6550
Date: 01/18/2008 Views: 4916
Date: 07/29/2007 Views: 5497
Date: 08/23/2023 Views: 805278
Port side bonded in place after tapping aluminium ring, and inserting cut down, scuff sanded and wet out with Redux 4-40 100 degree flat head screws. Screw heads and edge of aluminium ring packed with Redux/flox.