Date: 12/31/1969 Views: 3744
Date: 12/01/2004 Views: 6255
Date: 12/31/1969 Views: 3525
Date: 08/23/2023 Views: 709340
Port side bonded in place after tapping aluminium ring, and inserting cut down, scuff sanded and wet out with Redux 4-40 100 degree flat head screws. Screw heads and edge of aluminium ring packed with Redux/flox.