Login
EuropaOwners N914XL - Bob Borger, N.Texas, USA: 99.0 hrs - Subsequent Flights Album has been updated as of 2016 05 16. Tri-Gear Conversion
Advanced Search
Mount with WebDAV RSS Feed for this Album View Latest Updates View Popular Items View Random Items View Slideshow (Fullscreen)

N914XL - Bob Borger, N.Texas, USA: 99.0 hrs - Subsequent Flights Album has been updated as of 2016 05 16.

1. DSC_0064 2. First Flight 3. Subsequent ... 4. Tri-Gear... 5. Weight... 6. Aviation... 7. OSHKOSH 2007 ... 46. Fuel Tank...

Random Images

Ultimate ventilator installation and associated repair 11.

Ultimate ventilator installation and associated repair 11.

Date: 07/12/2009 Views: 6883

010702_petotube_mount

010702_petotube_mount

Date: 12/31/1969 Views: 4361

Tri gear with wings under fuse Bob.

Tri gear with wings under fuse Bob.

Date: 09/14/2010 Views: 7329

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 790459

Tri-Gear Conversion

After being blown off the runway on takeoff and into a ground loop at 40 kts, it has been decided to convert the aircraft from Monowheel to Tri-gear. This album documents this conversion and repair work. The album is not comprehensive as I often was up to my elbows in epoxy, fiberglas, Araldite and other nasty things when I would have wanted a picture or two. Still, you should be able to get an idea of what was involved. Work has almost been completed. The aircraft is flying again. Remaining work is to make interference fairings for the landing gear leg fairings to the wheel pants and body. I'll put the wheel pants on tomorrow and see how it goes. Without any go-fast fairings it does 110 KTS at 5000 RPM, 28 in MP & 3.6 gph.

Date: 10/02/2010
Owner: rlborger
Size: 345 items
nextlast
first previous
IMG_1422

IMG_1422

Brake plumbing pretty well done. Working on the brake bleed.

Date: 05/31/2011
Views: 5993
IMG_1444p

IMG_1444p

Completed the brake plumbing, filling and bleeding. Cockpit pretty much back together.

Date: 06/04/2011
Views: 4398
IMG_1446ann

IMG_1446ann

Final brake plumbing and other stuff installed below the tunnel.

Date: 06/04/2011
Views: 4627
IMG_1449p

IMG_1449p

Greatly simplified fuel plumbing, all cleaned up and tied down. Not a particularly good pic. I'll see if I can get a better one.

Date: 06/04/2011
Views: 4435
IMG_1459p

IMG_1459p

Work continued on the priming/sanding of the repaired areas like the port wing outer flap bracket

Date: 06/05/2011
Views: 4385
IMG_1460p

IMG_1460p

Starboard wing tip

Date: 06/05/2011
Views: 4944
IMG_1461p

IMG_1461p

Starboard wing outer flap bracket

Date: 06/05/2011
Views: 4874
IMG_1462p

IMG_1462p

and port wing root repairs.

Date: 06/05/2011
Views: 3948
IMG_1466p

IMG_1466p

A better picture of the simplified fuel plumbing under the baggage bay. Fuel into gascolator, thence to parallel electric pump and anti-back flow valve and on out to the engine driven fuel pump.

Date: 06/05/2011
Views: 4294
IMG_1469p

IMG_1469p

Cleaned up the tunnel area.

Date: 06/05/2011
Views: 4734
nextlast
first previous
Page: 1 ... 22 23 24 25 26 27 28 ... 35
Powered by Gallery v2.3