CG evaluation will likely be needed after we complete wiring!
Date: 03/18/2009
Views: 2899
IMG_5901post
Date: 08/09/2009
Views: 2647
Newest Image
EAA SITE
Date: 08/23/2023
Views: 85893
DSCN5316Ann
My friends Curt and Kent came over today and assisted in the hanging of the 914. Sure is a lot easier with help. Hung the engine, checked the engine cant as per installation instructions. The port/starboard difference is off by 1 or 2 mm out of the perfect 26mm. We thought that was close enough. Pulled the engine and applied cotter keys (split pins) to the castle nuts on the engine mount. Hung the engine a second time and bolted it down.