The center hole was tapped and used for 1st test mount, a big lightening hole will eliminate it
Date: 11/27/2013
Views: 7778
Fred fitting fairings 8.
Date: 02/15/2009
Views: 6273
09022003163259_G
Date: 12/31/1969
Views: 4216
Newest Image
EAA SITE
Date: 08/23/2023
Views: 708783
DoorLatch72
The two canopy frames were set with the aft edges down. Holes were drilled on the “upper†side of the guide for epoxy. A batch of Araldite 420 A/B was mixed and FLOX added for additional “body†and strength. The industrial syringe was filled with the FLOX mix. Half the FLOX was injected into each door.