Date: 12/17/2006 Views: 4223
Date: 07/25/2003 Views: 8429
Date: 08/01/2003 Views: 6451
Date: 08/23/2023 Views: 709571
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.