Date: 11/01/2010 Views: 7593
Date: 03/17/2011 Views: 9260
Date: 05/26/2004 Views: 3595
Date: 08/23/2023 Views: 859443
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.