Date: 12/16/2006 Views: 5932
Date: 02/25/2007 Views: 4617
Date: 03/17/2008 Views: 7078
Date: 08/23/2023 Views: 809928
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.