Date: 06/22/2009 Views: 5243
Date: 12/31/1969 Views: 3551
Date: 01/01/2007 Views: 6541
Date: 08/23/2023 Views: 702772
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.