Date: 08/08/2010 Views: 6412
Date: 12/31/1969 Views: 4222
Date: 10/25/2009 Views: 3780
Date: 08/23/2023 Views: 695262
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.