Date: 12/31/1969 Views: 4461
Date: 09/13/2010 Views: 8102
Date: 02/15/2008 Views: 5635
Date: 08/23/2023 Views: 810218
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.