Date: 01/09/2004 Views: 6243
Date: 06/10/2005 Views: 5639
Date: 08/19/2010 Views: 6877
Date: 08/23/2023 Views: 783649
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.