Date: 12/31/1969 Views: 5014
Date: 10/11/2009 Views: 6791
Date: 08/10/2009 Views: 6025
Date: 08/23/2023 Views: 807316
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.