Date: 07/29/2007 Views: 3714
Date: 04/17/2005 Views: 5117
Date: 10/25/2009 Views: 4950
Date: 08/23/2023 Views: 820501
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.