Date: 12/31/1969 Views: 4767
Date: 12/31/1969 Views: 9413
Date: 07/18/2007 Views: 5925
Date: 08/23/2023 Views: 819080
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.