Date: 09/22/2005 Views: 6058
Date: 07/08/2014 Views: 8144
Date: 03/10/2011 Views: 4427
Date: 08/23/2023 Views: 754489
Mixed up a batch of epoxy and applied two plies of BID over the inside of the guides to the fuselage. The port fore bolt-shoot guide bonded with Araldite and with 2 plies of BID laid up over.