Date: 08/10/2009 Views: 4405
Date: 07/29/2007 Views: 4737
Date: 10/11/2009 Views: 4556
Date: 08/23/2023 Views: 695155
Mixed up a batch of epoxy and applied two plies of BID over the inside of the guides to the fuselage. The port fore bolt-shoot guide bonded with Araldite and with 2 plies of BID laid up over.