Date: 11/09/2008 Views: 5355
Date: 06/14/2018 Views: 30965
Date: 03/22/2009 Views: 8252
Date: 08/23/2023 Views: 841816
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.