Date: 04/07/2006 Views: 2860
Date: 06/19/2009 Views: 3103
Date: 09/18/2010 Views: 3034
Date: 08/23/2023 Views: 103675
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.