Date: 09/08/2009 Views: 8512
Date: 06/19/2009 Views: 5433
Date: 12/31/1969 Views: 4555
Date: 08/23/2023 Views: 831870
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.