Date: 12/31/1969 Views: 2310
Date: 09/12/2009 Views: 2563
Date: 04/18/2009 Views: 2693
Date: 08/23/2023 Views: 98647
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.