Date: 11/29/2010 Views: 6042
Date: 08/21/2010 Views: 2963
Date: 06/19/2009 Views: 2334
Date: 08/23/2023 Views: 88806
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.