Login
EuropaOwners N914XL - Bob Borger, N.Texas, USA: 99.0 hrs - Subsequent Flights Album has been updated as of 2016 05 16. Weight Reduction & C/G Fix
Advanced Search
Mount with WebDAV RSS Feed for this Album View Latest Updates View Popular Items View Random Items View Slideshow (Fullscreen)

N914XL - Bob Borger, N.Texas, USA: 99.0 hrs - Subsequent Flights Album has been updated as of 2016 05 16.

1. DSC_0064 2. First Flight 3. Subsequent ... 4. Tri-Gear... 5. Weight... 6. Aviation... 7. OSHKOSH 2007 8. OSHKOSH 2008 ... 46. Fuel Tank...

Random Images

FillingFuselage10Ann

FillingFuselage10Ann

Date: 08/27/2004 Views: 3374

P9010196

P9010196

Date: 09/01/2007 Views: 8439

Door handel alignment to door 3

Door handel alignment to door 3

Date: 10/25/2009 Views: 7122

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 819485

Weight Reduction & C/G Fix

After the tri-gear conversion the aircraft proved to have gained excess weight (>50 lbs) and the empty C/G was at the forward limit. This album documents the weight reduction and C/G fix efforts.

Date: 11/24/2011
Owner: rlborger
Size: 50 items
nextlast
IMG_2309

IMG_2309

The obvious place to begin weight reduction was the ridiculously heavy instrument panel. Removed it and put the Garmin radios, etc. up for sale. Meanwhile, I began to lay out the instrument configuration in the old panel.

Date: 10/06/2011
Views: 11011
IMG_2307

IMG_2307

Cardboard cutouts and templates were used to shape and size the panels and to decide where instruments should go.

Date: 10/06/2011
Views: 7031
IMG_2313

IMG_2313

Panel plates were cut from aluminum and fitted to the fiberglass.

Date: 10/06/2011
Views: 7971
IMG_2312

IMG_2312

This was the more difficult fit of the three.

Date: 10/06/2011
Views: 11897
IMG_2451

IMG_2451

Templates were used to transfer the instrument locations to the aluminum panels for cutting.

Date: 10/24/2011
Views: 7362
IMG_2460

IMG_2460

Used our hydraulic punch to poke out the round holes. The rectangular holes were corner drilled and cut out with aircraft shears. Files were used to clean up the holes in shape and size.

Date: 10/27/2011
Views: 10943
IMG_2461

IMG_2461

The two main panels cut, poked and in place.

Date: 10/27/2011
Views: 11172
IMG_2452

IMG_2452

The Garmin equipment sold very quickly and the proceeds were used to buy the new instruments. Here are the 2 1/2" "backup" gauges with the Microair Comm & Xponder as well as the GRT EIS 4000 from the old panel. At this point I was sti

Date: 10/24/2011
Views: 7974
IMG_2447

IMG_2447

Started to make up the switch and breaker panel.

Date: 10/24/2011
Views: 8556
IMG_2456

IMG_2456

Drilling for the rivets to hold the anchor nuts required novel technique. Eventually, all anchor nuts were installed.

Date: 10/25/2011
Views: 7263
nextlast
Page: 1 2 3 4 5
Powered by Gallery v2.3